Solid Colour
(0)
 No matching options
Timber Look
(0)
 No matching options
Stone Look
(0)
 No matching options
Smooth
(0)
 No matching options
Matt
(0)
 No matching options
Woodmatt
(0)
 No matching options
Gloss
(0)
 No matching options
Sheen
(0)
 No matching options
Texture
(0)
 No matching options
Venette
(0)
 No matching options
Metallic
(0)
 No matching options

Connection of the Sewer from the home to the connection point in Mains sewer. Up to 10 LM included as standard inclusion.

Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 1

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom

Connection of the Sewer from the home to the connection point in Mains sewer. Up to 10 LM included as standard inclusion.

Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.

The standard inclusion Septic System - Is a treatment system including approx. 300 m2 Irrigation lines.

Includes Power supply & Sewer up to 10lm from home, Council Permit including plans & application - Final cost or design may vary pending council requirements (e.g., a larger irrigation field required)

Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 2

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom

The standard inclusion Septic System - Is a treatment system including approx. 300 m2 Irrigation lines.

Includes Power supply & Sewer up to 10lm from home, Council Permit including plans & application - Final cost or design may vary pending council requirements (e.g., a larger irrigation field required)

Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.

Standard Inclusion - Stormwater connection up to 10 LMDistance from the Stormwater connection point from home to Legal Point of Discharge (LPOD)*Subject to change based on Council final confirmation of LPOD or Council decision on location of discharge point on your property*

Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 3

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom

Standard Inclusion - Stormwater connection up to 10 LMDistance from the Stormwater connection point from home to Legal Point of Discharge (LPOD)*Subject to change based on Council final confirmation of LPOD or Council decision on location of discharge point on your property*

Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.

Properties with no mains water will utilise a Rain Water tank with a "sealed" stormwater drainage system connected.For surface/ground water drainage, a seperate stormwater system with 4 surface pits as standard will be required.

Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 4

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom

Properties with no mains water will utilise a Rain Water tank with a "sealed" stormwater drainage system connected.For surface/ground water drainage, a seperate stormwater system with 4 surface pits as standard will be required.

Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.

4 Included as standard

Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 5

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom

4 Included as standard

Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.
Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 6

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.
Note:

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 7

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.
Note:
No Options for
Add Options: use the Item 8 Options field in the
Site 06 - Sewer & Stormwater
category to select options.
OR
Hide Item: clear the Item 8 Name field in the
Site 06 - Sewer & Stormwater
category.

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 8

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.
Note:
No Options for
Add Options: use the Item 9 Options field in the
Site 06 - Sewer & Stormwater
category to select options.
OR
Hide Item: clear the Item 9 Name field in the
Site 06 - Sewer & Stormwater
category.

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 9

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.
Note:
No items found.
No Options for
Add Options: use the Item 10 Options field in the
Site 06 - Sewer & Stormwater
category to select options.
OR
Hide Item: clear the Item 10 Name field in the
Site 06 - Sewer & Stormwater
category.

No Options Available

Please make a selection in the previous section to see the options available for that selection.

Customise

Item 10

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Hide Item
Show Item
Customise Item
hidden-icon
Item Hidden
Not visible to clients. Excluded from summary report.
This is some text inside of a div block.
Note:
This is some text inside of a div block.
Price TBD
+
$
This is some text inside of a div block.
  •  Quantity:
This is some text inside of a div block.
This is some text inside of a div block.
This is some text inside of a div block.
:
Select option
Standard
Upgrade
Custom
Edit
Customise Option
Change the current instance of this option.
Option Name *
Custom
Unit Quantity *
Custom
Unit Cost ($) *
Custom
Total Cost
$
{{Total Cost}}
Check to replace price with 'Price TBD' and flag in summary if selected.
Custom
Unit Type
Custom
Variant Type
Custom
Variant List
Custom
SKU
Custom
Note
Custom
Check to mark in summary as needing changes to plan, and to notify Drafting when this option is selected.
Custom
Check to mark as the default option for this item. Should be priced at $0 and limit to one standard option per item.
Custom
Check to hide this option from the list.
Custom
Overrides List
Close
Save to update selections
Save
Radio button check icon grey

Selections Saved

Selected options have been saved to your specification.
Redirecting...
If this window is not automatically closed, use the close button in the top right corner.
Oh no! Something went wrong while submitting your selections. Please try again.