Standard Inclusion - Up to 300mm fall across the building site area up to a maximum of 650m2 area. Includes excavation and as per your request, to either stockpile and/or remove excess spoil from site for this standard inclusion scope of excavation work.Greater than 300mm Fall and/or sites over 650m2 area require an additional estimate for further Excavation - Site Specific AllowanceNote:Rock Breaking, contaminated soils, buried debris or waste to be removed or any other site sink hole, mine or unforeseen site ground condition are not included in Standard Inclusion and will form Variation to Owner. Retaining Walls not included in Standard Inclusion.
Greater than 300mm Fall and/or sites over 650m2 area require an additional estimate for further Excavation - Site Specific AllowanceNote:Rock Breaking, contaminated soils, buried debris or waste to be removed or any other site sink hole, mine or unforeseen site ground condition are not included in Standard Inclusion and will form Variation to Owner. Retaining Walls not included in Standard Inclusion.