Note:

The cost of the drafting process for a Lane Housing Co. design is included in the base price in the New Home Estimate you have been quoted. It is not an additional cost.The drafting process included allows for 82 hrs in total which covers our standard process and is suitable for most clients.If you have elected to make multiple changes to a Lane Housing Co design or are requesting a custom design floorplan, the time involved for drafting is longer.  Depending on the number of changes & the complexity of the changes and the number of revisions, the time to complete the drafting will vary.  Extra Drafting charges over the base pricing Concept Drafting allowance will be applied at an hourly rate of $60 Inc GST per hour and added to your Contract Price.  We will let you know if your changes are exceeding our drafting budget. Please discuss this with your sales consultant if you are concerned about the potential for extra drafting charges.Please refer to the Preliminary Agreement and its Terms & Conditions as you will be required to reimburse Lane Housing Co. for relevant Drafting - costs at time of cancellation, should you withdraw from this Preliminary Agreement or not build with Lane Housing Co.  Costs determined by hours worked per timesheets at hourly rate.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:

Examples of circumstances leading to extra fees for Drafting:Planning Permit Drafting Requirements, Landscaping plans, shed positions, pools plan, Flood Levels, Bushfire Overlays.If not stated in their individual section in this Preliminary Agreement, the rate for extra drafting is $60 Inc GST per hourI/We are aware that if we require extra drafting beyond the standard inclusions of this Preliminary Agreement, we will be charged for extra drafting costs. You will be notified if these circumstances apply to your project.Please refer to Item 31. Terms and conditions for explanation of reimbursement of Drafting costs should you withdraw from this Preliminary Agreement or not build with Lane Housing Co.

No Options for
Drafting - Extras
Add Options: use the Item 2 Options field in the
Site 07 - Drafting & Engineering
category to select options.
OR
Hide Item: clear the Item 2 Name field in the
Site 07 - Drafting & Engineering
category.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:

Our consulting Engineer will design your foundation according to the house design and the relevant soil classification and site levels. The Engineer design is specific to each unique home and site and is required before we are able to provide a fixed price for your foundations. We include the Engineer fee for your Lane Housing Co. design in your New Home Estimate. (Value Single Storey $825 Inc GST or $1025 Two Storey Inc GST)Extra Engineering charges apply for Retaining walls, split level homes, two-storey homes, homes with non-standard building materials or a complex design requiring steel or structural supporting beams. Custom Designed plans or significantly customised Lane Housing Co designs may also incur further Engineering Charges. Price to be confirmed if Extras are required.Extra charges for revisions (and delays) will also apply if the engineering requires revisions due to client changes after the first Engineers Report is obtained.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:

The Wind Rating Report is required by our Engineer and Window and Frame and Truss manufacturers for the structural assessment and design.Wind Rating Report - Travel outside - Bendigo Postcode Zone 3550, 3551, 3555, 3556 or Refund if Client has satisfactory Wind Rating Report

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:

The Soil Classification Report is required for the engineer as part of the design process for foundations. Soil Classification Report - Bendigo Postcode Zone 3550, 3551, 3555, 3556 - (Value Included in your New Home Estimate $488 Inc GST)Have a soil test already?If you have an existing soil classification report we will attempt to use it, however if our engineer or building surveyor decline it, we will require a new report to satisfy their requirements. Alternatively, they may request further detail or updates for which you can decide to proceed with arranging or start afresh with a new report sourced by Lane Housing Co at the price listed below.(Value: $488)

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:

Footing probe required to determine the depths of shed/carport footings. Engineer to then design a suitable method of construction to ensure there will be no damage to the shed/carport structure.

No Options for
Footing Probe
Add Options: use the Item 6 Options field in the
Site 07 - Drafting & Engineering
category to select options.
OR
Hide Item: clear the Item 6 Name field in the
Site 07 - Drafting & Engineering
category.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:
No Options for
Add Options: use the Item 7 Options field in the
Site 07 - Drafting & Engineering
category to select options.
OR
Hide Item: clear the Item 7 Name field in the
Site 07 - Drafting & Engineering
category.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:
No Options for
Add Options: use the Item 8 Options field in the
Site 07 - Drafting & Engineering
category to select options.
OR
Hide Item: clear the Item 8 Name field in the
Site 07 - Drafting & Engineering
category.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:
No Options for
Add Options: use the Item 9 Options field in the
Site 07 - Drafting & Engineering
category to select options.
OR
Hide Item: clear the Item 9 Name field in the
Site 07 - Drafting & Engineering
category.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise
Note:
No items found.
No Options for
Add Options: use the Item 10 Options field in the
Site 07 - Drafting & Engineering
category to select options.
OR
Hide Item: clear the Item 10 Name field in the
Site 07 - Drafting & Engineering
category.

No Available Options

Please make a selection in the previous section to see the available options.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
Customise

The following items have been hidden from the project. They do not need to be selected and don't count towards totals and selection progress.

To unhide: edit the item, uncheck the 'Hide Item' checkbox, and save.

Note: in future, hidden items will only be visible to admin users.

Customise Item

Close

Change the current instance of this item.

Name *
Custom
Note
Custom
Description
Custom
Check to hide this option from the list.
Custom
This is some text inside of a div block.
Note:
This is some text inside of a div block.
Price TBD
+
$
This is some text inside of a div block.
  •  Quantity:
This is some text inside of a div block.
This is some text inside of a div block.
This is some text inside of a div block.
:
Select option
Standard
Upgrade
Custom
Edit
Customise Option
Change the current instance of this option.
Option Name *
Custom
Unit Quantity *
Custom
Unit Cost ($) *
Custom
Total Cost
$
{{Total Cost}}
Check to replace price with 'Price TBD' and flag in summary if selected.
Custom
Unit Type
Custom
Variant Type
Custom
Variant List
Custom
SKU
Custom
Note
Custom
Check to mark in summary as needing changes to plan, and to notify Drafting when this option is selected.
Custom
Check to mark as the default option for this item. Should be priced at $0 and limit to one standard option per item.
Custom
Check to hide this option from the list.
Custom
Overrides List
Close
Radio button check icon grey

Selections Saved

Selected options have been saved to your specification.
Redirecting...
If this window is not automatically closed, use the close button in the top right corner.
Oh no! Something went wrong while submitting your selections. Please try again.